โ
Client Engr.
A. Mehta
07:45
3
During Pour
Live
In progress
4
Client Engineer
A. Mehta
โ
5
Post-Pour
Stage B
After pour
PC-2026-03-027 โ Client Engineer approved โ
SO-TN-2026-001
PC-2026-03-027
PRE-POUR
A โ Start conditions & checklist
โ Approved by Client Engr.
| Rebar & cover verified | |
| Formwork checked & clean | |
| Vibrator ready & tested | |
| Cube moulds ready | |
View full checklist โ
DURING POUR
B โ Truck batches, temperature & slump
Truck Batch Log
Note: Good workability, no segregation observed. Concrete placed continuously.
During-pour Checklist IS 456
| Check Item | Clause | Result |
| DURING CONCRETING |
| Time between Mixing & Pouring โค 90 min Cl.13.1 | Cl.13.1 | |
| Weight of Mix Ingredients verified (batch ticket) Cl.10.2 | Cl.10.2 | |
| W/C Ratio within design mix spec Cl.6.1 | Cl.6.1 | |
| Slump (mm) โ within specified range Cl.7 | Cl.7 | |
| Concrete Temperature โค 35ยฐC Cl.13.1 | Cl.13.1 | |
| Pour Start Time logged | | |
| Pour End Time logged | | |
| Cube Sampling โ sets taken, labelled & identified Cl.15.2 | Cl.15.2 | |