Beam C2โC4 pre-pour submitted at 06:30. Client Engineer has not approved. Escalate if concrete trucks are on-site.
| Pour Card | Drawing | Element | Location | Grade | Stage | Action |
|---|---|---|---|---|---|---|
| PC-026 | STR-COL-22 | Column ยท COL-B3-G+1 | B3โB5 | M25 | Pre-pour Draft | Fill checklist |
| PC-027 | STR-SLB-08 | Beam ยท BM-C2-C4 | C2โC4 | M25 | Pour approved ยท Live | Log truck data |
| PC-024 | STR-SLB-08 | Slab ยท SLB-FL4-A | FL-03 | M30 | Post-pour | Update curing |